Single Window Systems

In the OIC Member States

24

Post implementation: Closure of the Project

The deployment of the Single Window closes with the acceptance activities that include

internal and external testing, validation process, and conformance testing. Conformance

testing provides for last-minute corrections (minor bug fixes) of the Single Window. The

findings of these activities are entered in a Final Acceptance document. A large number of

documents and specifications, such as the source code design, or the internal user’s manual are

finalised and handed over to the Single Window operator.