Improving Transport Project Appraisals
In the Islamic Countries
146
Table 9.3: Data and information required for the Environmental Impact Assessment, based on
Royal Decree 34/2001
Category
Data and information required
First category
–
“Projects With Limited
Environmental
Impacts”
Applicant’s data
General information on the project
Description of the activity
-
Location
-
Size of the project area
-
Estimated number of residents within 250 meters of the project
-
Source of Energy and quantity of fuel used
Construction activities
-
Date of commencement and duration
-
Permits and licences
Second category
–
“Projects
With
Significant
Environmental
Impacts”
In addition to information for first-category projects:
Description of the project
-
Key characteristics of the project
-
Objectives
-
Justification
-
Major components
-
Technologies used
-
Volumes of inputs and consumables during construction and
operation (water for sanitary purposes; water for industrial
purposes; water for other uses; energy (fuel); raw materials
(types and quantities in detail); other
-
Volumes of Outputs, Emissions and Wastes (SO2 to the air;
suspended particles to the air; NOx to the air; Other to the air;
sanitary drainage water; industrial drainage water; domestic
solid wastes; industrial solid wastes; hazardous solid wastes;
construction material wastes
Description of construction works and methods of construction
used
Drainage Outlet Specifications
Most significant biological properties of the area (fauna, flora,
sanctuaries, antiquities, and resort areas)
Initial analyses of the environmental impacts
description of control and mitigation procedures and technologies
for various impacts
Third category
–
“Projects With Serious
Environmental
Impacts”
Presentation of The Project
Description of the project and its objectives
-
Goals
-
Need for the project
-
Components of the project
-
Project construction phases