at a minimum the creation of a civilian traffic management unit and the gradual devolution of the

traffic engineering function from the traffic police to these civilian traffic units as is the practice in

virtually all medium and large size cities in developing and developed countries. It must be recognized

that police are not adequately trained for this increasingly complex engineering function, and that

there is little prospect for this to occur in the future. By comparison, traffic engineering is being taught

at the university level in Egypt but those persons who are trained in traffic engineering applications

are typically not being hired by the public sector to pursue traffic engineering activities. This proposed

shift of traffic engineering responsibilities to civilian authorities will permit the traffic police to

concentrate solely on traffic enforcement.

Attracting, Retaining, and Training Staff

.

In addition to the creation of competent urban transportation institutions (such as GCRTA) is the

equally significant issue of attracting, retaining, and training qualified professional staff for addressing

the complex array of urban transport issues facing the GCR.

4.2.16. SWOT Analysis Summary

Strengths

Strategic location as an economic hub

(great economic potential)

Global recognition as an economic centre

Political stability

Investment opportunities/climate

Large and diverse population

Centre of agglomeration areas

GCTRA - the beginning of coordination of

activities

High demand for public transport

Weaknesses

Chronic traffic jams

Poor road safety record

Poor public transport system

Large area, large population and rapid

growth are difficult to manage

High motorization

No recognition of NMT policy

Weak enforcement of traffic laws

Lack of capacity

Concentration of activity in Cairo

Lack of public transport and NMT

planning in existing New Cities

Opportunities

Large population

Robust economy

Growth to be concentrated outside of

Cairo

Attractive for investment

Threats

Insufficient (transport) infrastructure

Weak technology and innovation

Risk of climate change