Urban Transport in the OIC Megacities
106
Figure 48: Extract from JICA Cairo Urban Toll Expressway Report
Source:
Consultant
4.2.14.5. 2006 East of Mediterranean Sea study
Carried out by MoT.
Considered logistics centres/dry ports/multi modal interchange.
Dry Port at 10
th
of Ramadan City proposed to link to Suez and at 6
th
of October City to link to
Sokhna Port.
Rail links also studied.
4.2.14.6. Cairo Vision 2050/52
Developed by General Organization for Physical Planning/MoH in 2008 and tied up with the 5 year
plans (issued 2007 and 2012).
4.2.14.7. World Bank/JICA Cairo Congestion Study 2008
PPP STRICA transport model used (since no one had access to the TRIPS 2002 CREATSmodel).
Estimated travel speeds and delays.
This is the last Transport master Plan approved for Cairo but all those met agreed that this is now out
of date and other studies are ongoing but are not approved.
4.2.14.8. Egypt Master Plan 2012 (MINITS)
CUBE transport model built - was an EU capacity building programme within this study with
training provided to staff at Transport Planning Authority – but these have now left.
Covered rail, roads and marine modes.