Planning of National Transport Infrastructure
In the Islamic Countries
79
3.3.2.
Institutional and Organizational Factors
Since the 1990s, Uganda has sought to improve its transport sector infrastructure in keeping
with its economic development and growing population and urbanisation, and this has been
reflected in significant governance investment and resultant initiatives in the transport sector.
The chronology of the changes should be of interest as it tells a story of pro-active reform that
explains why Uganda is a good case to study.
1991 Civil Aviation Authority was set up
1992 Uganda Railways was incorporated
1995 Uganda Constitution
1996 Road Sector Development Programme No 1
1998 Road Agency Formation Unit Set Up
2001 Liquidation of Ugandan Airlines Corporation
2002 Road Sector Development Programme No 2
2002 Draft National Transport Policy and Strategy
2006 Rift Valley Railway takes over the URC
2008 Uganda National Transport Master Plan 2008 2023 (NTMP)
2010 Uganda Road Fund
2010 Uganda National Development Plan No 1
2011 Kampala Capital City Authority set up
2013 Vision 2040
2014 Draft National Transport Policy and Strategy
2014 Draft Plan for Kampala Metropolitan Area
2015 National Development Plan No. 2
2015 Standard Gauge Railway Unit Set Up
2015 Strategic Implementation Plan for the NTMP
2015 Intended Nationally Determined Contribution INDC submitted (Climate Change)
2016 Rift Valley Railway wound up
2017 Road Sector Development Plan 3 under preparation
2017 Mid Term Review of the NTMP
2018 National Transport Master Plan 2020/2040
2020 National Development Plan No. 3
The main conclusions that can be drawn from this chronology is that the process was proactive
in reforming transport sector management from a centrally driven to a more modern and
devolved one. Each mode of transport was reformed and restructured to work more efficiently
and effectively with URC being leased out to Rift Valley Railways Ltd. The timeline also indicates
a flexibility and willingness to correct, revisions and reversals if objectives are not achieved. It
also shows that the transport plans, strategies and programmes were prepared hierarchically
(top down). An important comment is that only towards the end of the road map was the
usefulness of a new transport policy realised in 2014 – not at the beginning of the reform
process. However, national transport master-planning has become a proxy for policy making in
many countries including Uganda.