Previous Page  101 / 121 Next Page
Information
Show Menu
Previous Page 101 / 121 Next Page
Page Background

Annex 6 to OIC/COMCEC/36-20/REP

101

Policy Recommendation IV:

Utilizing contemporary collection (i.e. automated

electronic tolls, on-board-units, and Global Navigation Satellite System) and

enforcement systems for ensuring an effective transport infrastructure pricing.

Rationale:

The applied method and used technology are extremely vital for the better

management of the pricing of transport infrastructure. An effective and efficient toll

collection and enforcement system can leverage the abilities of the whole infrastructure

pricing system. Collection can be done by employees, automatic machines, or a

combination of both. Toll plazas and electronic tolls are two basic toll collection systems.

Toll plazas consist of a series of toll gates, where each gate only opens once the driver pays

the toll by cash, bank cards, vouchers, or others. On the other hand, electronic tolls

allow toll payment without requiring vehicles to stop. Vehicles are required to carry an

authorized on-board unit (OBU), electronic tag or transponder. Compared to toll plazas,

electronic tolls do not require toll gates, which minimizes construction costs and this

system can be implemented in high-density road networks. Some countries have a

hybrid system where conventional toll plazas coexist with electronic tolling systems.

Instruments to Realize the Policy Advice:

COMCEC Transport and Communications Working Group

: In its subsequent

meetings, the Working Group may elaborate on the above- mentioned policy areas in a

more detailed manner.

COMCEC Project Funding

: Under the COMCEC Project Funding, the COMCEC

Coordination Office calls for projects each year. With the COMCEC Project Funding, the

Member Countries participating in the Working Groups can submit multilateral cooperation

projects to be financed through grants by the COMCEC Coordination Office. For the above-

mentioned policy areas, the Member Countries can utilize the COMCEC Project Funding

and the COMCEC Coordination Office may finance the successful projects in this

regard. These projects may include organizing seminars, training programs, study visits,

exchange of experts, workshops and preparing analytical studies, needs assessments, and

training materials/documents.

---------------------